The ISAC β-NMR HomePage



Introduction to β-NMR
Publications
Students Projects
Contacts
Technical Information
Data Acquistion
Approved Experiments
Internal Page
Related Links
BNMR Wiki
Data Analysis
Photo Album

  • Download BNMRfit istallation script
  • Download BNMRfit
  • Download BNMRminfit

  • Shutting down the NMR vacuum pumps next up previous contents
    Next: DATA ACQUISITION Up: Changing and aligning samples Previous: Loading NMR in an   Contents

    Shutting down the $ \beta $ NMR vacuum pumps

    1. After completing a sample change( see section 6.3) ensure the loading rod has been moved into the lock and is supported with the brass rod, and SLV5 is closed. (The EPICS page entitled "BNMR Vacuum" should still be open.)
    2. Isolate the turbo pump by closing the inlet GV6.
    3. Spin down the trubo pump TP6 (i.e., turn it off; it will change from green to black on the display).
    4. Once the turbo pump has slowed isolate it from the roughing pump by closing BV6 and PV5.
    5. Turn off the roughing pump BP5 (it will change to black on the display).

    BNMR Web Site 2006-06-29



    Page last modified: 07/23/09 02:45 by Andrew MacFarlane.