The ISAC β-NMR HomePage



Introduction to β-NMR
Publications
Students Projects
Contacts
Technical Information
Data Acquistion
Approved Experiments
Internal Page
Related Links
BNMR Wiki
Data Analysis
Photo Album

  • Download BNMRfit istallation script
  • Download BNMRfit
  • Download BNMRminfit

  • Technical Information

    Technical Information


    This page contains technical information which is intended for those who are running an experiment.
    • Recently added documents*
    1. The EFG Tensor at High Symmetry Sites in Crystals, Andrew MacFarlane, May 30, 2007: EFG Tensors New
    2. The stopping distribution of low energy 8Li,  Andrew MacFarlane, March 23, 2007: Stopping Distribution
    3. Details of hyperfine coupling units, Andrew MacFarlane, March 9, 2007: Hyperfine Coupling
    4. Recent Analysis of back-scattering, Susan, Nov. 28, 2006:  Back-Scattering(.ppt)
    5. Check out our BNMR Wiki  (editable by BNMR users)

    • Detailed How-To For BNMR/BNQR*
    1. BNMR Manual(.pdf), Written by BNMR Group, compiled by Hassan Saadaoui, April 14, 2006.
    2. BNMR Manual(.html)
          * This will be continually updated.

    • Cryostat Operation
    1. BNMR Cryostat, Andrew MacFarlane and Masrur Hossain, May 5, 2006.

    • Polarizer and Related Topics
    1. Sodium Handling at the LEBT Polarized Beam Line at ISAC, Phil Levy, July 10, 2003.
    2. Tuning Alkali-Metal Ion Beams Through the Polarizer, Phil Levy, May 2, 2006.
    • Data Analysis
    1. Deadtime correction, Jahangir Valiani, May 27, 2005.
    • Beam Line and Spectrometers
    1. Conditioning the High Field Platform.
    2. Procedure for Loading Sample on the High Field β-NMR Spectrometer, Rob Kiefl, December 12, 2002.
    3. Running BNMR and BNQR in Dual Mode using the Fast Switching, Zaher Salman, Andrew McFarlane, May 13, 2012.
    • RF and Modes Setup Related Topics
    1. Setting up Low Frequency Sweep on the High Field Spectrometer, (Outdated) Andrew MacFarlane, April 1, 2004.
    2. How to for BNMR/BNQR mode 2e, Roger Miller, September 27, 2005.
    3. How to set up low frequency RF system on platform, Todd Keeler, April 11, 2006.
    4. Switching between pulsed and continuous wave(CW) RF, Todd Keeler, April 11, 2006.
    5. Pulsed RF mode theory, Rob Kiefl, May 20, 2005.
    • Calibrations and Calculators
    1. Calibration of the Low Field Spec. Magnet (ILE2A1:HH), Zaher Salman, April 22, 2004.
    2. Band Width to Pulse Duration Convertor, Zaher Salman, September 6, 2005.
    3. BNMR/QR HV SettingsAndrew MacFarlane, June 26, 2006
    • Troubleshooting
    1. Common Problems And Fixes, Masrur Hossain , October 6, 2005.

    • Miscellaneous
    1. Graphical display of camp variables Masrur Hossain, June 25, 2006.
    2. Watching out for variables when experiment is running Masrur Hossain, June 26, 2006



    Page last modified: 05/13/12 01:25 by Andrew MacFarlane.